The first half of May was probably my busiest work period throughout the year. The show was right around the corner and there was still so much left to do. Some of the work couldn't be ready in time for the show, but most of it was. After the show, the second half of May was much more calm. Serious work wouldn't resume again until early June.

Even though most of the work was done in early May, so many pictures were taken that just like the April Reports, May will also need to be divided into more than one post. There are a lot of pictures here to look at. Take a look at all of them, ask questions or leave comments and share. Thank you.

5/1/17: The second layer of pumice gel is done.

5/2/17: The pit firings are done. They turned out darker than I was hoping they would, but there's still a lot going on here. They're still interesting, so I won't redo them. I like them the way they are.

5/2/17: The first layer of pumice gel has been applied. I'm really liking how this piece is turning out so far.

5/2/17: I attempted the first layer of pumice gel, but I ran out of the stuff which really sucks.  This was not the time to run low on supplies. I immediately ordered more.

5/2/17: I decided to used Fiber Paste as the texture for this piece. Even though most of the piece is covered with it, I'm  still going to need to apply more of it later.

5/2/17: I did polishing work on this. It looks much better.

5/2/17: I did polishing work on this. It looks much better.

5/2/17: I did polishing work on this. It looks much better.

5/3/17: I glued on some foam board to give me a flat space for a name label.

5/3/17: I glued on some foam board to give me a flat space for a name label.

5/3/17: I glued on some foam board to give me a flat space for a name label.

5/3/17: I glued on some foam board to give me a flat space for a name label.

5/3/17: I finally managed to get some more drawing done on this piece. I should have had this finished a while ago.

Molding Paste has finally been applied to the back of this piece, though it will need more.

5/5/17: The second layer of Pumice Gel has been applied.

5/5/17: The second layer is done.

5/5/17: I made a name label.

5/5/17: Some touching up was done around the name label.

5/5/17: Some touching up was done around the name label. 

5/5/17: Some touching up was done around the name label.

5/6/17: More touching up was done, this time with the pumice gel. I did this in order to give the piece a better sense of consistency.

5/6/17: More touching up was done, this time with the pumice gel. I did this in order to give the piece a better sense of consistency.

5/6/17: The second layer is done.

5/6/17: The first layer is finally done.

5/6/17: More Fiber Paste work was done.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: A name label was finally put in place.

5/6/17: Touch up work was done around the name label using light molding paste.

5/6/17: Touch up work was done around the name label using light molding paste.

5/6/17: Touch up work was done around the name label using light molding paste.

5/6/17: Touch up work was done around the name label using light molding paste.

5/6/17: Touch up work was done around the name label using molding paste.

5/6/17: Touch up work was done around the name label using molding paste.

5/6/17: Touch up work was done around the name label using molding paste.

5/6/17: Touch up work was done around the name label using molding paste.

No comments: