During this week in November, I worked on one drawing and did molding paste work on two other pieces. Fiber paste work was also done during the week. It was getting to the point where the show was right around the corner and despite how fast work was getting work done, I always felt like there simply wasn't enough time. No matter how much I had achieved, there was always a lot more left to do. There were also things that would go wrong at the worst possible time such as having a glue gun break and finding out I made a huge mistake with one of the projects.
That's all I have for right now. Hopefully, I'll have Part 4 out soon. Feel free to ask questions and leave comments. Also, share this post with anyone who might be interested. If you want to support me and my projects, you can donate to my Patreon or buy buttons from my Etsy store.
11/18/18: The name label is in place. |
11/18/18: I started doing the canvas work. |
11/19/18: The canvas work is complete. |
11/19/18: The gesso work is complete. |
11/20/18: The Molding Paste work is complete. |
11/20/18: Molding paste work is complete. |
11/21/18: I started doing the fiber paste work on the bottom half of the the sides. |
11/21/18: I started doing the fiber paste work on the bottom half of the sides. It was a little tricky with this one. |
11/23/18: Fiber paste work on the top half of the sides and inner parts. This took longer than I had anticipated. |
11/23/18: The drawing is pretty much complete. |