2017 Progress Report: November/December

We're finally getting to the end of the 2017 Progress Reports. Since only one picture was taken in November, November and December were combined into a single report. With my show out of the way and after getting some much needed rest, what remained of the year, I focused on Autumn Decay, the one piece that I wasn't able to finish in time for my show. The results ended up mostly as I expected. It looks fine, but I don't love it yet. Maybe it's because It looks too similar to some work I made in the past, or maybe it is because I haven't seen it in the show yet. I deliberately decided not to work on anymore projects after that. It allowed me to think more about what I wanted to do in 2018.

Even though it is already March and I'm very late with 2018, I decided that the next post will outline what I have planned for the year. After that, the January and February Progress Reports will be posted. 

11/28/17: I finally applied the last layer of pumice gel on the front.

12/5/17: I finally applied the last layer of pumice gel on the back.

12/7/17: The spray paint work was done.

12/7/17: The spray paint work was done on the back except for the middle because of the name label. I'll have to do some detailed painting on that area later.

12/12/17: The black and white painting work is done. This took longer than expected.

12/12/17: The black painting work on the back is done. As with other similar projects, the back doesn't need as much detail as the front, so white paint wasn't necessary.

12/12/17: The metallic paint work is done. Like always, I applied the metallic paint with a palate knife.

12/12/17: The metallic paint work on the back is finished.

12/13/17: The polymer gloss medium has been applied to the front.

12/13/17: The polymer gloss medium work is done on the back. Autumn Decay is finally finished.